Skip to contentAller au contenu

Viau Station

Viau is a station on the Green line, in the Mercier–Hochelaga-Maisonneuve borough.

It opened on June 6, 1976.

It has a single official access, step-free.

station viau en

Lines and connections

On the Green line (Angrignon–Honoré-Beaugrand): towards Honoré-Beaugrand, the next station is Assomption; towards Angrignon, it is Pie-IX.

It is the 22nd of 27 stations on the Green line: about 28 minutes from Angrignon and 8 minutes from Honoré-Beaugrand.

The ride to Berri-UQAM, in the city centre, takes about 9 minutes.

See all 92 stations on the network.

Exits and street access

Viau station: 1 exit, 1 of them step-freeViau station: 1 exit, 1 of them step-free. Main entrance N 50 m Viau Main entrance Exits Step-free access Exits: STM (GTFS, CC BY 4.0)

The STM lists 1 access for Viau. ⚠️ These are the official édicules, not every single door.

Station Viau

Step-free access.

Hours

TowardsMonday to FridaySaturdaySunday
Angrignon05h36 – 00h4405h36 – 01h1405h36 – 00h44
Honoré-Beaugrand05h58 – 01h0705h58 – 01h3705h58 – 01h07

Planned timetable, not real time.

The hours page has the timetable for every line, and the fares page explains ticket prices and zones.

Frequency

On weekdays trains run about every 2 minutes during the morning peak and every 3 minutes midday.

Accessibility

Viau is one of the 25 Montreal Metro stations with step-free access. Its only access is step-free.

Getting here

6 STM bus routes stop within a short walk of Viau: 34, 85, 125, 136, 353, 362.

Viau is a short walk from Biodôme de Montréal, Aréna YMCA Hochelaga-Maisonneuve and Cinéma Starcité Montréal.

Frequently asked questions

The first train leaves at 05h36 on weekdays.

It has 1 official access: see the diagram.

Yes, it has step-free access.

On this page

Schedule and access data from the STM. Map data © OpenStreetMap contributors.